What Happens After You Sign Your Order – Step-by-Step Build Timeline

Just signed your order? Here’s exactly what happens next. From survey and approvals to manufacturing and installation. So you know what to expect at every stage.

last updated Nov 5, 2025
category Guides
Share with friends

Once you’ve signed your order, the excitement begins. But you need to know – what happens next?

At Precision, we believe the process should feel clear and predictable from the very start.
That’s why we’ve laid out every step below. Showing who does what. When it happens, and what you can expect along the way.

We want you to feel fully in control of the process.

🧾 1. Order Confirmation & Welcome Pack (Days 1-2)

Once your order is confirmed and deposit paid, you’ll receive a set of emails to get everything started:.

  • Your Order Confirmation – confirming your chosen specification and design.
  • Project Manager Intro + Process Outline – our project manager introduces themselves and an email version of this blog on the process.
  • Charity Selection Email – so you can pick which charity we donate to on your behalf.
  • Your Agreement – the signed contract via your phone or computer.

💡Precision Tip: Save these emails. They contain your project reference, agreed specification, and payment details.

📏 2. Survey Visit (Week 1-2)

Our appointed surveyor will arrange a visit.

They’ll take final measurements and confirm every important detail with you.

During the visit, we’ll:

  • Check ground levels, walls, and drainage.
  • Confirm door and window openings.
  • Review any changes or additions since the original quote.
  • Run through any final questions

Once complete, you’ll receive a survey confirmation summarising everything agreed.

🧱 Precision Promise: Any adjustments discussed on site are always confirmed in writing, so there are no surprises later.

🏛️ 3. Planning or Building Regulation Approvals (If Required)

Not every project needs formal approval. But if yours does, we’ll manage it for you.

We’ll prepare and submit the necessary drawings and liaise with the relevant authorities on your behalf.

You’ll be kept informed throughout the process and notified as soon as approval is granted.

⚠️ Important: Your 6–8 week production timeline begins after approvals are granted, not after the order date. This ensures everything built on site complies with the final approved plans. 

Ensuring complete peace of mind.

 

⚙️ 4. Manufacturing & Scheduling (Weeks 3-6)

Once the survey is complete (and approvals confirmed if needed), your project moves into production.

We send all verified measurements and specifications to the manufacturer, who begins creating your frames, roof and glazing.

Meanwhile, our office team:

  • Books your installation slot on the build schedule.
  • Prepares your Payment Schedule so you can plan upcoming stage payments.
  • Confirms your Frame Balance payment before delivery.

📦 When the frames and roof are ready, we’ll confirm the delivery date with you and ensure a Precision representative is on-site to accept it.

🔨 5. Installation (Weeks 6+)

On your scheduled start date, the build team arrives on site to begin work

The installation follows a clear order:

  1. Groundworks and base construction
  2. Frame and roof installation
  3. Plastering, electrics, and finishing touches

Your Project Manager stays in contact throughout the build to keep everything running smoothly and on time.

🧱 Typical build duration: Most installations take around 4-6 weeks once on site, depending on design and weather conditions.

🪟 6. Final Steps & Handover

Once your new space is complete we ensure every detail meets Precision’s standards.

You’ll then receive:

  • Your handover pack, including warranty and care information.
  • Your final invoice, issued only once the work is complete and approved.
  • Final photos for your finished project..

🎉 Your new space is now ready for decoration and furnishing. A bright, warm, functional room built to last.

🧰  7. Aftercare & Support

Our service doesn’t end when the build does.

If you ever have a question about your warranty or need support with any aspect of the finished work, our aftercare team is here to help.

We’ll make sure any issues are resolved quickly and professionally, keeping your new space performing exactly as it should.

🛠️  The Precision Promise: On Time. On Budget. World-Class Service.
That’s our commitment from first visit to final sign-off.